Bicycle paths Wrocław

Subject

Preparation of full technical documentation together with accompanying services, including author's supervision over the implementation of the project "Construction of cycle paths under the Warsaw, Szczytnicki, Jagielloński and Osobowicki bridges in Wrocław"

THE PURPOSE OF THE INVESTMENT

The aim of the investment was to build bicycle paths under the road and railway bridges in Wrocław in order to enable collision-free crossing of bridge crossings. The designed crossings connected the existing bicycle routes along the Oder boulevards, thus maintaining the continuity of the crossing.

SCOPE OF INVESTMENT

The scope of the development included:

  • Design of a bicycle path under the Szczytnicki bridge in Wrocław enabling collision-free crossing of national road No. 8 along the left bank of the Old Oder River. The designed bicycle route connects the pedestrian and bicycle route located along ul. Ludwika Pasteura with boulevards on the opposite side of the Szczytnicki bridge. The length of the passage was 180.0m.
  • Design of a bicycle path under the Warsaw road bridges (old and new) and the Warsaw railway bridge along the left bank of the Old Oder River. The length of the passage was 393.00 m.
  • Design of a bicycle path on the right bank of the Sailing Canal led under the Warsaw road bridges (old and new) and under the Warsaw railway bridge. The length of the passage was 512.00 m.
  • Design of passage under Jagiellonian bridges in Wrocław to enable cyclists riding along the left bank of the Flood Canal to cross national road no. 8 without collisions along Jana Kochanowskiego and Aleksandra Brucknera Streets. The length of the passage was 600.0m.
  • Design of the passage under the railway viaduct No. 271 of Wrocław-Poznań relation (the Poznań railway bridge) and thus achieving continuity of the cycling route along the right bank of the Oder river boulevards by connecting the cycling paths along the crown of the Różanka embankment. The length of the passage was 180.0m.

Under the contract, a multi-variant concept was developed, a project information sheet, water law reports for the execution of water structures and obtaining a decision on a water law permit, construction design and obtaining a decision on a building permit, traffic organization projects, executive documentation, cost documentation, specifications for the execution and acceptance of works.