Subject
Preparation of full technical documentation together with accompanying services, including author's supervision over the implementation of the "Modernization of the Wrzeszczyn Barrage" project.
THE PURPOSE OF THE INVESTMENT
The aim of the investment was to restore the facility to its proper technical condition and enable its further failure-free operation by repairing the existing Wrzeszczyn water barrage.
SCOPE OF INVESTMENT
The scope of the development included:
- Design of renovation of weir, hydroelectric power plant and solid partition on the side of upper water.
- Design of repair and sealing of inlet chambers of hydroelectric power plants.
- Design of renovation of the retaining wall on the right bank.
- Design of renovation of the retaining wall on the left bank, together with a reinforcement of the left bank slope and replacement of the railings.
- Design of renovation of drive housings.
- Design of renovation the maneuvering area and the access road to the machine hall.